Please be advised that construction of the new pedestrian (push-button activated) signals at Sunnidale Road South and Wasaga Sands Drive is scheduled to begin at the end of August 2025. D Rock Paving has been awarded the contract to undertake the work on behalf of the Town of Wasaga Beach.
Please be advised that construction works will take place within the municipal road allowance and may include but not be limited to:
- Curb and asphalt works, minor grading works and erosion and sediment controls;
- installation of pedestrian signals;
- signage and boulevard restoration.
As you may expect, there will be some disruption to traffic during construction; however, every effort will be made to keep this to a minimum.
If you have any specific questions or concerns during construction, please contact the Contract Administrator, Cole Matson (Town of Wasaga Beach) at (705) 429-2540 ext. 2342.
Thank you for your anticipated cooperation.
Town of Wasaga Beach
Mike Pincivero, P.Eng.
Manager of Engineering Services
30 Lewis Street, Wasaga Beach, ON, L9Z 1A1 NOTICE issued August 15th, 2025.